AVAR Construction Systems, Inc.
Drilling and Shoring Post-Tensioning Contact us Home

Award Winning Bridges
Current projects 2009/2010
   

Post-Tensioning

The Division is involved in the manufacture and installation of multi-strand, grouted post-tensioning systems for Engineering Structures including cast-in-place bridges on falsework and segmental construction, reservoirs, stadiums, seismic retrofit of concrete and steel structures etc. Management of the company was instrumental in the rapid growth of post-tensioning in the early 1970's including the formation of the Post-Tensioning Institute (PTI) in 1973 and later in the forming of the American Segmental Bridge Institute (ASBI) in 1989.

The range of our services includes feasibility studies, budget estimates and value engineering by our in-house team of registered engineers. Installation of our systems is performed by our highly trained specialists.
home