AVAR Construction Systems, Inc.
Drilling and Shoring Post-Tensioning Careers Contact us Home
Representative Systems
Current projects 2009-10

     

In addition to listed representative systems, we have recently completed or are currently working on various projects
using one or more of our earth retaining systems:



Soil Nail/Shotcrete Walls

Acacia Creek Retaining wall for widening, Union City, CA
Decatur Blvd. Las Vegas Retaining wall for highway 15 widening, Las Vegas, NV
Route 5/134 interchange Retaining wall for highway 5 widening, Santa Clarita, CA
Route 680 in Fremont Retaining wall with Grade 97 soil nails, Fremont, CA
Pismo Beach Highway 101 Highly visible retaining wall with limited space, Pismo Beach, CA
Chino Hills Soil nails for Highway 91 widening, Corona, CA

Tiebacks, Temporary and Permanent
Route 134/Olive Shotcrete and Tiebacks, Burbank, CA
Redcrest Tiebacks for retaining wall, Redcrest, CA
UC Berkeley Boalt School of Law Slope stabilization and shoring, Berkeley, CA
Elk Permanent tiebacks on Highway 101, Elk, CA
Baldwin Park Temp. and Permanent Tiebacks on existing freeway, Baldwin Park, CA
Van Duzen Tiebacks for highway widening, Redding, CA
Watt Ave Retaining wall for highway 50 widening, Sacramento, CA

Design/Build Shoring
UC Berkeley Cal Stadium Soldier Piles and Shotcretre for excavation support of Cal Stadium, Berkeley, CA
Bowles Hall Soldier beams/lagging and underpinning for school excavation, Berkeley, CA
Sequoia Hospital Design build shoring, Redwood City, CA
Jackson Courtyard Commercial Development Soil nail and shotcrete facing for support of excavation in basement,
Oakland, CA
Parcel G Drilled Piers, lagging and soldier beams housing units, San Francisco, CA
Delta Diablo Soil Nails and shoring, Antioch, CA
Highland 1000 Resovoir Soil Nails, Shotcrete for support of excavation at resovoir tank, Hayward, CA
San Francisco General Hospital Small loading dock shoring with wood lagging and soldier beams, San Francisco, CA

Tiedowns and Micropiles

San Francisco Airport Micropiles for columns with loads up to 400 kips, San Francisco, CA
220 Golden Gate Micropiles for footing support, San Francisco, CA
West Oakland BART Micropiles for BART seismic upgrades, Oakland, CA
Nordstrom's Walnut Creek Micropiles with upgraded capacity for Nordstrom's, Walnut Creek, CA